Road and Utility

ROAD AND UTILITY

CEG Road and Utility Projects

Marlin Street Roadway Improvement

The Marlin Street roadway improvement project in Port Canaveral, FL, consisted of the demolition of an existing roadway and its reconstruction covering 1.75 acres. We provided new storm-water collection and treatment systems, as well as electrical engineering for street lighting.

Grouper Road and Utility Rerouting 

(Phases I and II)
For two separate projects, CEG provided the roadway and utility relocations, including the storm-water treatment system. The roadway, utilized by mostly heavy-duty and concrete truck traffic, is critical to the north cargo piers and concrete silos. Fully coordinated with the channel corner-cut projects necessary to widen the Port Canaveral, FL’s, channel for new cruise ships. CEG permitted with Canaveral Port Authority staff, City of Cocoa, City of Cocoa Beach and four separate Florida Department of Environmental Protection offices.

Grumman Place Realignment

For two separate projects in Melbourne, FL, CEG provided the roadway and utility relocations including the storm-water treatment system. The roadway, utilized by mostly heavy duty truck traffic including concrete trucks, is critical to the north cargo piers and concrete silos.

Testimonials

“I have found CEG’s group of engineers to be very professional to work with. Each discipline provides timely responses and thorough documentation. I would recommend CEG’s group of structural and MEP engineers.”

Lawrence Maxwell, AIA LEED President, Spacecoast Architects, P.A.